Project: 3-phase power supply
Date: January, 2026
Location: Edinburgh

Project Detail
This project was carried out for Whitebox Cocktails in Edinburgh, where additional power infrastructure was required to support a new canning production line.
The aim of the installation was to provide reliable, compliant power supplies suitable for industrial equipment, while ensuring the system could safely accommodate current and future operational demands.
Our work included:
Installing new three-phase and single-phase power supplies
Fitting a full metal containment system for safe cable management
Supplying and installing a new distribution board
Installing IP65-rated industrial sockets suitable for the production environment
Fitting an emergency stop button for operational safety
Completing a full Electrical Installation Certificate (EIC) and issuing all relevant certification
The completed installation now provides a robust and safe power system capable of supporting the client’s new production equipment, ensuring compliance with current electrical standards and supporting ongoing business operations.
Visit our page on industrial electrical work for more information on the services we provide across Scotland. Alternatively, you can return to our home page.
Alternatively, please follow this link to return to our home page.
Related Projects
How can we help?
After clicking "SEND MESSAGE" please wait for confirmation that we have received your message. Thanks!
Glasgow
0141 357 3557
Edinburgh
0131 235 2909
afselec@live.com
Address
7 Thornwood Rd,
Glasgow, G11 7RA









